Blog

PROJECT: Waste Clients Caught Without an Environmental Permit

In our first case the client ran a small waste transfer station as part of his diversification strategy for his farm.
AMS (1)

Related Articles

Metal Recycling Facility

PROJECT – Metal Recycling Facility, South Yorkshire

Peak Associates have been instructed by a metal recycling facility in South Yorkshire to assess their site for acceptance of MRF-can waste, coded as European Waste Code 19 12 02 ferrous metal.
20210524_103420

PROJECT: Flood Risk Assessment – Warehouse, Greater Manchester

A client of ours acquired land adjacent to a river with the intention of building a warehouse. However, the company proceeded with the construction without obtaining the necessary planning permission from the local council.

This website uses cookies to ensure you get the best experience on our website. Learn more