UK Aquaculture
An aquaculture fish farm, located in the UK, hired us to assist with the Environmental Impact Assessment and prevent pollution in their catchment area.
SuDS Design For Extension To a Mental Health Facility:
With only 21 days until the existing planning consent expired we had to design a conceptual scheme, consult with local landowners and the LPA and then submit a RIBA 3 developed design for approval.
Flood Cause Analysis and Ongoing Advice To a Mill Owner Who Is A Charitable Trust
In many ways this work was initially a simple Flood Risk Assessment with the rather unusual twist that the flood had already happened.
Incident Management
Sometimes things go wrong. And in our experience, nearly every time something goes wrong, clients are slow to react, and issues that could have been abated often worsen.