SuDS Design For Extension To a Mental Health Facility:

With only 21 days until the existing planning consent expired we had to design a conceptual scheme, consult with local landowners and the LPA and then submit a RIBA 3 developed design for approval.
Land Contamination and Pollution Incident response after a fire

Peak were appointed by a loss assessor after a fire that started in the garage of a residential property spread to an oil tank used by the local Methodist Church.
Site Investigation at a Bulk Storage Terminal, Yorkshire and Humber Area

This extensive site investigation was for a client we have worked with for over 20 years.
Phase 1 Site Investigation, Stoke

An old pottery factory in Stoke was a long-abandoned site that had been used for the production of ceramics for many decades.
Contaminated Land

Our contaminated land team is driven by a passion to get sustainable schemes approved by the planners as soon as possible.