Waste Acceptance Criteria Testing For Several UK Construction Sector Clients
We undertake this type of WAC or ‘waste testing’ for a number of construction sector and waste sector clients.
SuDS Design For Extension To a Mental Health Facility:
With only 21 days until the existing planning consent expired we had to design a conceptual scheme, consult with local landowners and the LPA and then submit a RIBA 3 developed design for approval.
Flood Risk Assessment – Warehouse, Greater Manchester
A client of ours acquired land adjacent to a river with the intention of building a warehouse. However, the company proceeded with the construction without obtaining the necessary planning permission from the local council.
Site Investigation at a Bulk Storage Terminal, Yorkshire and Humber Area
This extensive site investigation was for a client we have worked with for over 20 years.
Phase 1 Site Investigation, Stoke
An old pottery factory in Stoke was a long-abandoned site that had been used for the production of ceramics for many decades.
Contaminated Land
Our contaminated land team is driven by a passion to get sustainable schemes approved by the planners as soon as possible.
Flood Risk Assessments
Flood Risk Assessments (FRA) and/or Sustainable Drainage designs (SuDs) are now required for all sites of greater than 1ha, or in other sensitive locations.
Foul Drainage Services
Peak Associates has a wealth of over 20 years’ experience in foul drainage investigation and design.
Sustainable Drainage Schemes (SuDS)
Changes to planning policy in recent years have led to the increased requirement for Sustainable Drainage Schemes (SuDS) to be included in the design of new developments. This change has been led by flooding and sewer capacity concerns due to the amount of green and brownfield sites being developed.